Jump to all,
I have a part that I converted into sheet metal so that I can use it in costing. So it creates two bodies in the list of welded parts (image1)
So I exclude the one I don't want and I take the sheet metal model (image2)
It gives me a price (7.22€) using the sheet metal function, so everything is fine (image3)
But if I reopen the room the price changes (picture4)
It's the cost of manufacturing that goes up, any idea why?
Thank you