I created a bill of materials template in EPDM. I can get it out well in excel. On the other hand, during extraction, the order of assembly is not respected in the EPDM BOM module. In the example attached, I should have the MON51432 first while in epdm nomenclature I have the s-e kit profinet Is there a setting?
Hello
To my knowledge, no configuration possible. I don't know what it is based on (maybe date and time of archiving) but the only reliable way is from a drawing. The BOM integrated in the plan can be displayed.