Deferred Drawings Problem ( Task "Release Model(s)" )

Hello

I'm having a problem with the "Deferred Drawings" option in the "Release Model(s)" task in the Specification Flow.

My goal is to postpone the generation of drawings from that of my 3D model.

My project has two parts:

- 1 child project that generates the 3D model and associated drawings

- 1 parent project that generates x (child project) according to the number of children I wanted when I ordered (Child Specification List)

Currently in the flow of my child project, I put an * in the "Deferred Drawings" option when the state containing my "Release Model(s)". Then in the next state, I use the Task "Clear Deferred Flag For Specification Drawings" while entering the SpecificationID.

The transition from one state to another is then done from the parent project by a transition activated by the user when he wants to generate the drawings.

My problem is this, when I activate the transition to generate my drawings, I have an error that appears in the Report during the action "Clear Deferred Flag For Specification Drawings" telling me that there is no specification with the id entered saved in the group.

And indeed when I look in my Specification folder, I find my specification of the parent project, but I can't find the specifications of the child projects.

Has anyone ever encountered this problem? or would have an idea of where I am making a mistake ? 

If you ever need more explanations, don't hesitate to ask me.

Thank you.

Kind regards.

 

Hello

I found the solution to my problem:)

Until now I used the Task "Clear Deferred Flag For Specification Drawing" in the flow of the child project when I had to place this Task in the flow of the parent project.

To sum up:

- We specify "Deferred Drawing" in child projects

- Flags in the parent project are deleted

Kind regards.