Hello
I have a problem with my drawings when I draw construction lines.
If I understand correctly, SW considers my climbs to be piloting and shows mistakes. To solve this problem, I have to set the dimensions to Piloted.
I didn't have this problem before, do you have a solution to that?
Kind regards
FYI, no need to draw a construction line for an angle or a dimension:
Otherwise you rib in the room or the MEP to have controlled ribs? If it's in the room, it's logical since you dimension 2 times the same thing, the angle and the dimension defining the angle (80.2) so one or the other must be piloted so as not to overstress.
3 Likes
Great, thank you, I didn't know this way of ribbing the corners.
I size the room but normally it doesn't do that. I will now do this method, thank you.
As the angle dimension exists, the other side must be controlled. SW doesn't understand if 2 different ribs drive the same function.
If you want the piloted to start automatically in case of overrating, you can check this in the options:
1 Like
That's what I was missing, thank you.
The option you showed me previously doesn't work in my case.
1 Like
A_R
May 14, 2025, 7:33am
6
Hello v_vidal,
To add another additional notice to your request, you can put this rating directly in your 3D, so it will appear in your MEP. @+. AR
Sylk
May 14, 2025, 7:51am
7
If it works, it is to define them when a rating is created, not to correct a lot of bad quotes that have already been created.
Unless it's an old version of SW? Otherwise indeed it's supposed to work.
1 Like