In a welded construction part, I realized a combined function of 3 bodies. Before this function in the list of welded parts, the sum of the 3 lengths that SW brings out to me is about 5.5 ML, after this function, it is more than 10 ML. Is this normal? And has anyone ever had this problem and more importantly, how to solve it?
I have created three linear bodies in angles of length (100,150,50), I combine the bodies, and the solidworks shows me a double length (600),o0 while the visualization cube is correct 300mm. (no comment)
Excellent remark, fortunately I have never used this function in CS.
The right way would be to avoid the function in question for CSs, and if it is not possible to take over the part, it is always possible to get around the problem with the visualization cubes, the reference dimensions, the measurements via the equations..., while disabling the link of the length property and assigning the right value.
If you want to leave your mechanically welded "autonomous" but still have the cumulative length of the 3 construction sketches, you can create a new 3D sketch and convert your trajectory sketches inside, it is then possible to convert the 3D sketch obtained into a single measurable trajectory.